Hydro Power Plants of “Shkalle”, “Cerruje”, ”Bejni 1, 2” and “Klos”

VEGA Group, part of Energy Partners Al, as Joint Venture, has signed a Concessionary Contract with Ministry of Economy, Trade and Energy for Construction and using “Shkalle”, “Cerruje”,”Bejni”,”Bejni 2” and “Klos” Hydro power plants.
The Concession is for a period of 35 (thirty five) years from the date of signature of this contract .
This Hydropower plants are under construction in these following streams:Bargajt, Valit, Palesh, Ahut, Molles, Klos-Mat district.
Installed power of each hydro power plant will be as follows:
“Shkalle” Hydropower Plant
Installed power 1089 kW
“Cerrunje” Hydropower Plant
Installed power 2864 kW
“Plesha” Hydropower Plant
Installed power 2206 kW
“Benji 1” Hydropower Plant
Installed power 1560 kW
“Benji 2” Hydropower Plant
Installed power 1269 kW
“Klos” Hydropower Plant
Installed power 700 kW
Annual production of electricity would be in total: 39.568.479 kWh

Description of main works:
• Infrastructure mobilization (road opening service)
• Flattering filing and compression with machinery
• Massive soil excavations and rock demolition
• Escarpments excavations
• Deviation of streams
• Drainage structure mobilization (concrete pipe,plastic pipe, tombine reinforced concrete)
• Placement of gravel layer
• Concreting structure reinforced concrete (art receipt, central tubes of discharge, basin for pressure)
• Construction of carrying walls with gabions
• Placement of concrete tubes for water derivation
• Foundation excavation
• Masonry works
• Concreting concrete anchors