Construction of Kukes – Morine Highway LOT 2
Detiled designs and construction of (2) two viaducts to a height of 60m and to a maximum length of 440m
• Excavations on hard rock
• Preparation and installation of foundations and structures, beams and slabs of high classes reinforced concrete
• Hydro-insulation membranes
• Installation of neoprene plates
• Installations of elastomeric bearings
• Drainage of bridge slabs
• Construction of road and all substratum layers
• Handrails installations
• Security fences
• Road lighting
• Horizontal and vertical road marks and sign etc.
According to KTZ and KTP Albanian requirements and Design Technical Conditions