Construction of Kukes – Morine Highway
Detalied designs and construction of 5 (five) viaducts to a height starting from 18m to 28m to a maximum length of 270m and repairing of the existing slide road.
- Excavations on hard rock
- Preparation and installation of foundations and structures, beams and slabs of high classes reinforced concrete
- Gabion wall
- Geogrid layer
- Terramesh
- Hydro-insulation membranes
- Installation of neioprene plates
- Installations of elastomeric bearings
- Drainage of bridge slabs
- Construction of road and all substratum layers
- Handrails installations
- Security fences
- Road lighting
- Horizontal and vertical road marks and sign etc.
According to KTZ and KTP Albanian requirements and Design Technical Conditions